5 reasons to use cold formed steel (CFS) construction for your projects

Cold Formed Steel (CFS), also known as light gauge steel (LGS), construction is a practical, code approved solution to many of the limitations that builders face today when using traditional construction materials.

Here are five key reasons why CFS construction methods using advanced construction automation systems are superior to traditional building methods.

1. It’s faster.

Light framing construction is faster than traditional methods, especially during manufacture and construction phases of a project.

CFS fabricators supply frames pre-assembled, strong and straight, and clearly identifiable. No on-site welding or cutting is normally required. This means that the erection process is fast and simple.

Advanced tooling functions available in advanced construction automation systems like global supplier, FRAMECAD, allow high productivity and versatile output to produce roof trusses, wall frames and floor joists — all to exact measurements, saving time in the construction stage.

Shorter construction times result in reduced hard costs of build projects.

As an example, by building with CFS over traditional heavy materials like concrete and masonry, you can shave 3 months or more off the schedule of a mid-rise project.

2. Highly-skilled on-site labor is not needed.

Using highly accurate design and engineering software, pre-engineered steel framing is cut to specified lengths, labeled and pre-dimpled, making assembly simple, fast and accurate. And the only tool needed for assembly is a power drill and provided screws and fasteners.

Due to its ease of assembly, less skilled labor is needed on-site, which has obvious bottom-line benefits.

3. It’s versatile.

The strength and ductility of light gauge or cold formed steel makes it an ideal building material for all building types — from modular and pre-fabricated units to multi-story hotels, hospitals, schools as well as stand-alone, multi-story housing. Cold formed steel is suited to almost any type of building design or application and with one of the highest strength-to-weight ratios of all construction materials, it is possible to produce architectural designs not possible with traditional methods.

4. It offers greater ROI.

CFS construction is cost-competitive compared to traditional methods and, depending on the building design, can be cheaper when evaluating the overall build cost due to its advantages in speed of construction, accuracy and reduced labor costs.

Cold formed steel construction is also highly scalable, which means it is an ideal solution for mass production and repeatable designs – a huge advantage in areas in need of affordable, quality housing, specifically in developing countries.

Long-term building maintenance costs are also reduced as steel is resistant to rot, mold, termite and insect infestation.

5. It’s better for the environment.

With traditional methods, it is common for builders to factor in up to 20% material wastage in the total cost of a project. Adding this up over consecutive projects, wastage can be equivalent to as much as one building out of every five buildings constructed. But with CFS waste is virtually non-existent (and in the case of a FRAMECAD solution, material wastage is less than 1%).

And, steel is 100% recyclable, reducing the overall environmental impact of any waste created. Additionally, cold formed steel is a ‘dry’ system, which means there is no need to use (often limited) water resources for mixing cement or other materials.

CFS construction methods using advanced construction automation systems make for faster build times, lower overall costs, more versatile, scalable design solutions and better building performance.

When these advantages are combined with the innate characteristics of steel, such as non-combustibility, termite and mold resistance and dimensional stability, CFS construction provides the framework for a solid, sustainable building program.

Note: This article have been indexed to our site. We do not claim legitimacy, ownership or copyright of any of the content above. To see the article at original source Click Here

Related Posts
Gigafactory in Brandenburg: Tesla presents missing documents for approval procedures thumbnail

Gigafactory in Brandenburg: Tesla presents missing documents for approval procedures

Elon Musk kommt der Inbetriebnahme seiner Giga Factory einen Schritt näher. Brandenburgs Ministerpräsident Woidke warnt jedoch davor, ein zu hohes Tempo an den Tag zulegen. Grünheide Ursprünglich sollten zum Jahresende die ersten Fahrzeuge vom Band laufen. (Foto: dpa) Grünheide Eine wichtige Hürde für die Entscheidung über die erste europäische Fabrik von US-Elektroautobauer Tesla in Grünheide bei…
Read More
Top 10 Altcoin Performer Showcase for September 2021 thumbnail

Top 10 Altcoin Performer Showcase for September 2021

September was a relatively bearish month for the cryptocurrency market. Bitcoin (BTC) decreased by 8%, and only three tokens posted triple digit rates of increase. This was in stark contrast with August, when more than ten tokens posted triple digit rates of increase.  The ten altcoins that increased the most during September were: Celer Network…
Read More
Bithumb executive arrested in South Korea on embezzlement charges thumbnail

Bithumb executive arrested in South Korea on embezzlement charges

Home » Business » Bithumb executive arrested in South Korea on embezzlement charges South Korean police have apprehended Bithumb owner Kang Jong-hyun on suspicion of embezzlement and breaching relevant sections of the country’s capital market laws. Media outlet JTBC News reported the arrest of the exchange’s executive on Thursday, days after investigators applied for an arrest warrant. The Seoul Southern
Read More
Tether Takes On WSJ: Calling Out Misleading Reporting & Bias thumbnail

Tether Takes On WSJ: Calling Out Misleading Reporting & Bias

You are here: Home/ News/ Tether Takes On WSJ: Calling Out Misleading Reporting & BiasTether, a leading stablecoin issuer, has slammed the Wall Street Journal (WSJ) for what it calls outdated, inaccurate, and misleading coverage and allegations against the company. In a recent blog post, Tether accused the WSJ of publishing 84 negative articles about or
Read More
Index Of News
Total
0
Share