When Matt Burke left a long-time position to start Blue Mountain Mechanicala plumbing services and construction company based in Parker, Colorado, he knew that he was taking a big risk. The MEP industry was (and remains) under consistent and dynamic market pressures that include a scarcity of skilled labor, cost pressures, strict regulations, and supply chain disruptions that lead to some of the lowest average profit margins in the construction industry. The likelihood for profitability and on-time completion is razor thin, and mistakes can sink projects with uncanny speed.
The more uncertainty in an estimate, the greater the contingency you’ll add to offset risk, which raises your price and increases the chance that you won’t win the work. By contrast, when you can eliminate all or most of your estimating guesswork, you can increase bid competitiveness, optimize profits, and improve your company’s financial stability overall.
But how do you make that work? Enter Dyllon Briggs. With a long career in MEP detailing, estimating, and execution, as well as a deep knowledge of software options that support MEP contractors’ success, Burke tasked Briggs with one specific assignment: determine the best method to eliminate all or most of Blue Mountain’s estimating guesswork and tedium in order to increase bid speed and competitiveness, optimize profits, and improve project outcomes.
BIM For the Win
But where does this type of data live? Immediately, Briggs thought of Building Information Modeling (BIM), a process involving the generation and management of digital representations of the physical and functional characteristics of projects. When using the right software tools, a BIM model becomes a data-rich resource that can offer the unparalleled level of detail required to help deliver projects as envisioned, on budget, and with teams collaborating efficiently. If Briggs could begin his estimating process by building a model of the project at hand, he could then leverage all of the data included to build his estimate.
With Good Data Comes Good Decisions
Briggs didn’t have the time or the know-how to manage a vast content library, but he did know of a solution that did: Trimble SysQue. An MEP-focused add-on to Revit, SysQue includes the world’s largest library of managed content. The database includes content from 630 manufacturers and millions of brand and part-specific MEP objects, a number that grows consistently.
“I said, ‘Matt, the only way we can estimate from Revit is if we get SysQue. It’s going to be so much easier and more accurate.’ Every fitting in the world is in there, including some that we didn’t know existed!”
By modeling in Revit using SysQue, Briggs could be certain that every single item in his projects would include up-to-date pricing and parameters. The detail from his coordinated models, then, could ensure Blue Mountain’s estimates were accurate in real-time. Final quantities, materials, and manufacturer information for buyouts could all be found within one single source of truth: The BIM model. Could leveraging a model in this way allow Blue Mountain to rise above its competition?
How Do You Make It Look So Easy?
Fortunately for Briggs, Burke, and Blue Mountain Mechanical, SysQue offers more than just an extensive content library. SysQue is also directly integrated with Estimation MEP, a web-based estimating and takeoff solution from Trimble, to enable a model-based estimating workflow. Using SysQue to design fabricable models, and then pushing the model data to Estimation MEP with a click of a button, Briggs produces estimates with relative ease, and with confidence in his accuracy which means he does not have to build in a large buffer for error.
“Burke was spending between three and five days on a project and he wasn’t getting as accurate. And I’m spending between one and three days on a project, and I’m more accurate.”
The results of such accuracy speak for themselves:
“I’m landing something like 25% of the bids and we were only hoping for 10%.”
We Don’t Have Problems, Just More Work To Do.
A jump from a 10% to 25% win rate, while estimating twice as fast as before, has left Blue Mountain Mechanical with a very good problem on its hands: too much business. A series of wins—each with considerable profit—has meant that Matt Burke is hiring fast and marketing less while he catches up.
“The model-based estimating workflow has been a game changer for us,” said Briggs. “It’s more accurate, which is the big key. I’ve done this for seven years: coordinating in the field or model-based coordination. So when I’m looking at these buildings, I’m drawing it like I would install it. [With SysQue and Estimation MEP] I’m getting more accurate footage, more accurate fittings, and just much more accuracy in general. And rather than what Burke would do, which would be to take Blue Beam, trace it, pull linear footage, add some extra numbers to it, I’m actually drawing it whole, and easily, with my estimate pretty much creating itself.”
To learn more about Trimble SysQue and Estimation MEP, visit mep.trimble.com.