Browsing Tag
Permasteelisa
1 post
Permasteelisa lands £25m curtain wall deal from Multiplex
The design phase is currently ongoing at Permasteelisa’s design centre in Italy, where the bespoke elements of the façade will also be assembled in its specialist manufacturing facility. The installation phase for the 15,500 sq m façade is planned to start at the end of March next year, with scheduled completion expected after 12 months.
July 31, 2024