Turner tops out $260M SeaTac renovation project

An article from
site logo

Project Milestones

The six-story renovation on C Concourse at Seattle-Tacoma International Airport is on track to achieve LEED Gold status, according to the contractor.

Published Jan. 10, 2025

A rendering of the renovated C Concourse at Seattle-Tacoma International Airport.

A rendering of the renovated C Concourse at Seattle-Tacoma International Airport.

Courtesy of Turner Construction

This audio is auto-generated. Please let us know if you have feedback.

Turner Construction has reached a new altitude on its $260 million expansion of C Concourse at Seattle-Tacoma International Airport. 

The New York City-based contractor topped out the steel on the 226,000-square-foot structure, completing vertical construction, according to a Dec. 20 news release. 

The six-story renovation project will add four levels to the existing building to provide enhancements for passengers. The upper floors will introduce expanded dining and retail options, additional seating and a 1,300-square-foot extension to the passenger waiting area, the contractor said in its release. 

Key features include a rooftop photovoltaic array, a meditation room, a nursing room and two airfield observation decks.

Initially targeting LEED Silver certification, the project is on track to achieve LEED Gold, Turner said, due to its innovative integration of energy-efficient systems and sustainable elements.

“This project exemplifies how we can construct essential infrastructure that benefits both travelers and the environment,” said Bill Ketcham, vice president and general manager at Turner, in the release.

The project is scheduled for substantial completion in 2026.  

Note: This article have been indexed to our site. We do not claim legitimacy, ownership or copyright of any of the content above. To see the article at original source Click Here

Related Posts
Softr: Build custom business apps without code thumbnail

Softr: Build custom business apps without code

Softr is a powerful business tool that enables users to quickly and easily build custom apps for their business without requiring any coding knowledge. With Softr, users can turn their existing data sources such as Airtable, Google Sheets, or SmartSuite into client portals, internal tools, project management tools, CRMs, content calendars, applicant trackers, and more.
Read More

Kraken Daily Market Report for January 02 2022

Overview Total spot trading volume at $545.5 million, the 30 day average is $1.25 billion. Total futures notional at $111.3 million. The top traded coins were, respectively, Bitcoin (-0.9%), Ethereum (+1.7%), Tether (0%), Polkadot (+3.8%), and USDC (0%). Strong returns from Energy Web Token (+11%) and Ankr (+12%). January 02, 2022  $545.5M traded across all markets today Crypto, EUR, USD, JPY, CAD, GBP, CHF, AUD  BTC $47304. ↓0.9% $141.1M ETH $3832.0 ↑1.7% $125.6M USDT $1.0002 ↑0.0% $93.5M DOT $29.701 ↑3.8% $36.2M…
Read More
Index Of News
Total
0
Share